Paver Calculator
Counting pavers: pure geometry, plus the cutting tax
Pavers per square foot is just 144 (square inches in a square foot) divided by one paver’s face area:
| Paver size | Face area | Per sq ft |
|---|---|---|
| 4 × 8 in | 32 sq in | 4.50 |
| 3.75 × 7.5 in (Holland) | 28.1 sq in | 5.12 |
| 6 × 6 in | 36 sq in | 4.00 |
| 6 × 9 in | 54 sq in | 2.67 |
| 12 × 12 in | 144 sq in | 1.00 |
| 24 × 24 in slab | 576 sq in | 0.25 |
Multiply by your area for the exact count, then add the cutting allowance — 5% for a simple rectangle with a running-bond or stack pattern, 10% or more for curves, borders in a contrasting size, or 45-degree herringbone, which cuts at every edge. Patterns do not change the area a paver covers, but diagonal layouts turn edge waste from a rounding error into a line item, and running short by twenty pavers from a different dye lot is a visible mistake. The calculator defaults to 5% and lets you set your own.
The base: where patios actually succeed or fail
Pavers are the visible 10% of the job; the base decides whether the patio is still flat in five years. The standard pedestrian build-up: excavate, compact the soil, lay 4 inches of gravel compacted in lifts (6 inches where cars will drive), then 1 inch of coarse bedding sand, screeded level and not compacted before laying. Volumes for the 100 sq ft example: gravel = 100 × (4 ÷ 12) = 33.3 cubic feet = 1.23 cubic yards; sand = 100 × (1 ÷ 12) = 8.3 cubic feet = 0.31 cubic yards. Order gravel about 20% loose over the compacted figure — it arrives fluffy and compacts down — so roughly 1.5 cubic yards for this patio.
After laying comes jointing sand swept into the gaps and a plate-compactor pass that settles the pavers into the bedding and locks the field together; polymeric jointing sand, swept in and misted, resists weeds and washout better than plain sand. Edge restraint — a spiked plastic or metal edge, or a concrete haunch — is not optional: without it the field slowly spreads at the borders and the joints open. None of this shows in the paver count, which is why the calculator reports base and sand volumes alongside: they are the difference between a materials list and a finished patio.
Worked example
Patio 10 × 10 ft, 4 × 8 pavers, pedestrian base: area 100 sq ft × 4.5 = 450 pavers; +5% = 473 to order. Gravel at 4 inches: 1.23 cubic yards compacted (order ≈1.5 loose). Bedding sand at 1 inch: 0.31 cubic yards — about 8–9 standard 60 lb bags if you are buying bagged rather than bulk, though bulk is far cheaper at this scale. Jointing sand is extra and small: roughly one 50 lb bag per 25–35 sq ft with standard joints, so 3–4 bags. Total patio weight is not trivial — 473 concrete pavers at about 5 lb each is over a ton — so, as with blocks, plan on delivery. Switch the base to 6 inches for a driveway and the gravel rises to 1.85 cubic yards compacted; the paver count does not change, but for vehicles you would also step up to thicker (80 mm) pavers, a specification question this count cannot answer for you.
Frequently asked questions
How many 4×8 pavers do I need for 100 square feet?
450 exactly — a 4×8 paver covers 32 square inches and there are 144 square inches in a square foot, so 4.5 pavers per square foot. With the standard 5% allowance for cuts and breakage, order 473. For a patterned or curved job allow 10% (495). The same maths for other sizes: 6×6 pavers need 400 per 100 sq ft, 12×12 need 100, and 24×24 slabs need 25.
How much gravel and sand do I need under pavers?
For a pedestrian patio: 4 inches of compacted gravel and 1 inch of bedding sand. Per 100 sq ft that is 1.23 cubic yards of gravel and 0.31 cubic yards of sand. Gravel is delivered loose and compacts by roughly 20%, so order about 1.5 cubic yards. Driveways take 6 inches of base (1.85 cubic yards per 100 sq ft). Jointing sand for the gaps is separate and small — roughly a 50 lb bag per 25–35 sq ft.
How deep should I dig for a paver patio?
Add the layers: paver thickness (typically 2⅜ inches for 60 mm pavers) + 1 inch of bedding sand + 4 inches of compacted base = about 7⅜ inches, so excavate roughly 7.5 inches below your finished level, a little more where the finished surface must sit below a threshold or step. Driveways: about 9.5 inches with the 6-inch base. Dig to a consistent depth and compact the exposed soil before the gravel goes in — a soft spot left un-compacted becomes a dip in the finished patio within a season.
Do I need to add extra pavers for cutting?
Yes. A straight rectangular patio in a simple pattern wastes about 5% to cuts and the odd breakage; curves, diagonal herringbone and contrasting borders push it to 10% or more. The allowance is not pessimism — edge pavers almost always need cutting to fit the boundary, and a paver dropped on concrete from waist height rarely survives. Order the allowance from the same production batch: pavers bought later can differ in shade enough to show, especially in strong colours.
Can I lay pavers directly on soil or sand only?
You can, and it is the most common reason patios fail. Without the compacted gravel base, soil movement, frost and water turn a flat field into a wavy one within a couple of winters, and weeds colonise the wide, soil-filled joints. The 4-inch base with edge restraint is the industry-standard minimum for a reason. The one acceptable shortcut is for very light-duty stepping-stone paths, where individual slabs on a small gravel bed per stone are a deliberate, rustic design rather than a patio.